This form of substructure construction is the most appropriate and effective for deep foundations necessary to sustain the high capacity loads generated by building and infrastructure works.
The reinforced concrete diaphragm wall is the most essential supporting structure for deep excavation, berthing wharves, car parks and underground railways.
The company has developed several soil improvement methods, the most common are jet grouting and soil cement columns.
PTT LNG Nong Fab Client : ITALIAN-THAI DEVELOPMENT PLC. Location : Rayong Completion Date : Jul 19 – Dec 19 Description of Works Diaphragm Wall Work Diaphragm Wall 0.80 x 31.00 m. depth – 1,957 m2
Read MoreMRT Purple Line – C3 – DW for Samyot Station Station (PP23) Client : ITD-NWR MRT JOINT VENTURE Location : Bangkok Completion Date : Description of Works -under construction
Read MoreMRT Purple Line – C3 – BR & DW for Memorial Bridge Station (PP24) Client : ITD-NWR MRT JOINT VENTURE Location : Bangkok Completion Date : Description of Works -under construction
Read MoreInterchange on Highway No.121 between Highway 108 & Highway 1008 Intersection (Yak San Klang Section) Client : Chiangmai Construction Co., Ltd. Location : Chiang Mai Completion Date : Description of Works -under construction
Read MoreMRT Purple Line – C3 – IVS04 – IVS05 Client : ITD-NWR MRT JOINT VENTURE Location : Bangkok Completion Date : Description of Works -under construction
Read MoreDrainage Canal at Bang Ban – Bang Sai Project, (Phra Nakhon Si Ayutthaya) – Contract 5 for Bridge Client : Italian – Thai Development Plc. Location : Phra Nakhon Si Ayutthaya Completion Date : Description of Works -under construction
Read MoreWater Tunnel along Ratchapruk Road From Khlong Mahasawas to Phetkasem Road Client : Italian -Thai Nawarat Joint Venture Location : Bangkok Completion Date : Description of Works -under construction
Read MoreMRT Purple Line – C3 Client : Italian – Thai Development Plc. Location : Bangkok Completion Date : Description of Works -under construction
Read MoreDrainage Canal at Bang Ban – Bang Sai Project, (Phra Nakhon Si Ayutthaya) – Contract 5 Client : Italian – Thai Development Plc. Location : Phra Nakhon Si Ayutthaya Completion Date : Description of Works -under construction
Read MoreBridge across the Chao Phraya River at Kiak Kai Area Section 2 Client : Italian – Thai Development Plc. Location : Bangkok Completion Date : Description of Works -under construction
Read MorePPL5 – BP, BR for Viaduct P1-273 (PP27-33) and Pilot Testing (2 points) Client : Italian – Thai Development Plc. Location : Bangkok Completion Date : Description of Works -under construction
Read MoreKhlong Premprachakorn Drainage Tunnel Project (From Khlong Bua to Chaophraya River) [Diaphragm Wall & Bored Pile] Client : ITD-NWUR MRT JOINT VENTURE Location : Bangkok Completion Date : Description of Works -under construction
Read MoreModification Work of Marine Offloading Facility (MOF), Thai Oil Client : ITALIAN-THAI DEVELOPMENT PLC. Location : Sriracha Completion Date : Nov Nov19-Jan20 Description of Works Piles Wall Work Bored pile dia. 1.50 x 20.00 m.– Nrs 34
Read MoreNue District R9 Client : Noble Development Public Company Limited Location : Bangkok Completion Date : Jun 22 – Sep 22 Description of Works Bored Piling Works Bored Pile Dia 0.80×56.00 m.- 53 No. Bored Pile Dia 1.00×56.00 m.- 170 No. Bored Pile Dia 1.20×56.00 m.- 59 No. Pile Wall Dia 0.60×18.00 m.- 320 No.
Read MoreDrainage Canal at Bang Ban – Bang Sai Project, (Phra Nakhon Si Ayutthaya) – Bridge No.7 Client : ITALIAN-THAI DEVELOPMENT PLC. Location : Phra Nakhon Sri Ayutthaua Completion Date : Mar 22 – Aug 22 Description of Works Bored Piling Works Bored Pile Dia 0.80×55.00 m.- 72 No. Bored Pile Dia 1.20×55.00 m.- 44 No.
Read MoreTrue Leasing Port Client : Charoen Pokphand Engineering Co.,Ltd Location : Phra Nakhon Sri Ayutthaua Completion Date : Apr 22 – May 22 Description of Works Diaphragm Wall Diaphragm wall 0.80 m. thickness, toe level 20.00 m. — Nrs1,237.20 m3
Read MoreOneAsia Data Center Project. Client : OneAsia Data Center Co., Ltd. Location : Nava Nakorn Industrial Estate, Pathum Thani Completion Date : Mar 22 – May 22 Description of Works Bored Piles Work Bored pile dia. 0.80x 46.00 m.– Nrs 358
Read MoreExtension of Chaiyapruk Road. Client : Tipakorn Co., Ltd. Location : Chaiyapruk Road. Completion Date : Jan 22 – May22 Description of Works Bored Pile Work Bored pile dia. 0.80x 35.00 m.– Nrs 136 Bored pile dia. 1.50x 58.00 m.– Nrs 45
Read MoreResidential Building Plot A of National Authority Client : AGC 10 Co., Ltd. Location : Bangkok Completion Date : Dec 21 – Mar 22 Description of Works Bored Pile Work Bored pile dia. 0.80x 56.00 m.– Nrs 254
Read MoreOne Bangkok Project. Client : ITALIAN-THAI DEVELOPMENT PLC. Location : Bangkok Completion Date : Jan 22 – May22 Description of Works Diaphragm Wall Diaphragm wall 1.00 m. thickness, toe level 38.30 m. — Nrs 4,200 m3
Read MoreDIB Artspace Bangkok Client : O Ground Co., Ltd Location : Bangkok Completion Date : Nov 21 – Feb 22 Description of Works Bored Pile Work Bored pile dia. 0.60x 35.00 m.– Nrs 175 Bored pile dia. 0.60x 15.00 m.– Nrs 245 Bored pile dia. 0.60x 12.00 m.– Nrs 104 Bored pile dia. 0.60x 9.00
Read MoreIOT Institute Building Project Client : ITALIAN-THAI DEVELOPMENT PLC. Location : Sriracha Completion Date : Dec 21 – Mar 22 Description of Works Bored Pile Work Bored pile dia. 0.60x 12.00 m.– Nrs 92 Bored pile dia. 0.80x 12.00 m.– Nrs 168 Bored pile dia. 1.00x 12.00 m.– Nrs 729
Read MoreHighway No.415 Phangnga – A.Bantakhun Client : SCG 1995 Co., Ltd Location : Surat Thani Completion Date : Feb 21 – May 21 Description of Works Bored Piles Work Bored pile dia. 0.80x 25.00 m.– Nrs 192
Read MoreDusit Central Park Bangkok Project Client : ITALIAN-THAI DEVELOPMENT PLC. Location : Bangkok Completion Date : Jan 21 – Mar 21 Description of Works Soil Cement Column SCC dia. 0.90x 15.00 m.– Nrs 1,018
Read MoreSURATTHANI INTERCHANGE AT HIGHWAY ROUTE NO.41 AND HIGHWAY ROUTE NO.417 Client : ITALIAN-THAI DEVELOPMENT PLC. Location : Surat Thani Completion Date : Nov 20 – June 21 Description of Works Bored Piles Work Bored pile dia. 0.80x 36.00 m.– Nrs 204 Bored pile dia. 1.00 x 36.00 m.– Nrs 204
Read MoreEscent Hatyai Client : CPN Residence Co., Ltd. Location : Chumphon Completion Date : Jan 21 – Mar 21 Description of Works Bored Piles Work Bored pile dia. 0.80x 45.00 m.– Nrs 113 Bored pile dia. 1.00x 45.00 m.– Nrs 46 Bored pile dia. 1.20x 45.00 m.– Nrs 39
Read MoreBridge over Irrigation Cannel between Pathomporn Junction – Baan Khaobor, Chumphon Client : Chumphon Asphalt Co., Ltd Location : Chumphon Completion Date : Dec 20 – Feb 21 Description of Works Bored Piles Work Bored pile dia. 1.00x 20.00 m.– Nrs 96 Socket In Rock 1.00 m.
Read MoreHighway No.3902 (West Ring Road) Section 2 Client : Tanasin Patana (1999) Co., Ltd. Location : Phra Nakhon Sri Ayutthaua Completion Date : Jun 20 – Feb 21 Description of Works Bored Piles Work Bored pile dia. 0.600 x 38.00 m.– Nrs 55 Bored pile dia. 0.80 x 46.00 m.– Nrs 160
Read MoreHighway Route No.35 Bangkhuntien-Ekkachai Section3 Client : ITALIAN-THAI DEVELOPMENT PLC. Location : Bangkok Completion Date : Nov19 – Aug 21 Description of Works Bored Piles Work Bored pile dia. 0.60 x 33.00 m.– Nrs 84 Bored pile dia. 1.00 x 53.00 m.– Nrs 100 Bored pile dia. 1.20 x 53.00 m.– Nrs 48 Barrette Pile
Read MoreMRT Pink Line Project (Khae Rai – Minburi) Client : Sino-Thai Engineering & Construction Plc. Location : Bangkok Completion Date : Dec 17 – Mar 21 Description of Works Bored Piles, Barrette pile Work Barrette 3.00 x1.20×49.00 m. – Nrs. 164 Bored Pile 1.50 x49.00 m. – Nrs 594 Bored Pile 1.80 x49.00 m. –
Read MoreMotorway Route no.81 Section13 (Bangyai – Kanchanaburi) Client : NPA Construction Co.,Ltd Location : Bangyai Completion Date : Jun 20 – Aug 20 Description of Works Bored Piles Work Bored pile dia. 0.80 x 36.00 m.– Nrs 148 Bored pile dia. 1.20 x 53.00 m.– Nrs 16 Bored pile dia. 1.50 x 53.00 m.– Nrs
Read MoreMRT Orange Line Project Contract E3(Hua Mak – Khlong Ban Ma) Client : ITALIAN-THAI DEVELOPMENT PLC. Location : Bangkok Completion Date : Sep 18 – Jun20 Description of Works Jet Grouting Works Jet Grouting dia. 1.60 m. — Nrs 308
Read MorePTT LNG NONG FAB LNG RECEIVING TERMINAL PROJECT, SEAWATER ONSHORE INTAKE BASIN Client : ITALIAN-THAI DEVELOPMENT PLC. Location : Rayong Completion Date : Dec 19 – May 20 Description of Works Pile wall Pile wall dia. 1.50 x 26.50 m.– Nrs 52 Pile wall dia. 1.00 x 19.50 m.– Nrs 115
Read MoreMRT Yellow Line (Lat Phrao-Samrong) Client : Sino-Thai Engineering & Construction Plc. Location : Bangkok Completion Date : Dec 17 – Jul 20 Description of Works Bored Piles Work Bored pile dia. 1.80 x 45.00 m.– Nrs 10 Bored pile dia. 1.50 x 45.00 m.– Nrs 15 Diaphragm wall Works Diaphragm wall 800 mm., 21.00
Read MoreUnderpass on San Pa Tong Bypass Client : Chaingmai Construction Co.,Ltd Location : Chaingmai Completion Date : Dec19-Aug20 Description of Works Bored Piles Work Bored pile dia. 0.80 x 19.00 m.– Nrs 624 Diaphragm wall Diaphragm wall 800 mm., 20.00 m. depth – 33,460 m2
Read MoreHighway 304 from Pakthongchai to Kabinburi Client : Tanasin Patana (1999) Co., Ltd. Location : Kabin Buri, Prachinburi Completion Date : Mar20-Jul20 Description of Works Bored Piles Work, Rock socket 2.50 m. Bored pile dia. 0.80 x 19.00 m.– Nrs 122 Bored pile dia. 1.00 x 19.00 m.– Nrs 48
Read MorePaolo Hospital Chokchai 4 Client : Bangkok Dusit Medical Services Plc. Location : Bangkok Completion Date : May 20 – Jul 20 Description of Works Bored Piles Work Bored pile dia. 0.80 x 36.50 m.– Nrs 172
Read MoreMRT Yellow Line Project (Lad Phrao – Samrong Section) Client : Sino-Thai Engineering & Construction Plc. Location : Bangkok Completion Date : Dec 17 – Jul 20 Description of Works Bored Piles Work Bored pile dia. 1.80 x 45.00 m.– Nrs 10 Bored pile dia. 1.50 x 45.00 m.– Nrs 15 Diaphragm wall Works Diaphragm
Read MoreThe Crest Park Residence Client : SC NNR1 Co., Ltd. Location : Bangkok Completion Date : Aug 20 – Sep 20 Description of Works Bored Piles Work Bored pile dia. 1.00 x 60.00 m.– Nrs 98
Read MoreQueensland Hotel Client : Diamond Park Co.,Ltd Location : Bangkok Completion Date : May 20 – Jul 20 Description of Works Bored Piles Work Bored pile dia. 1.00 x 58.00 m.– Nrs 82 Bored pile dia. 1.20 x 58.00 m.– Nrs 38
Read MoreNew Office Building of National Intelligence Agency Project Client : Woranitath Co.,Ltd Location : Phaholyothin Soi 3 Completion Date : Jun 20 – Sep 2 Description of Works Bored Piles Work Bored pile dia. 0.80 x 45.00 m.– Nrs 187 Diaphragm wall Diaphragm wall 800 mm., 24.00 m. depth – 5,256 m2
Read MoreExtradosed Bridge over Maeklong River Client : A.S. Associated Engineering (1964) Co., Ltd. Location : Ratchaburi Completion Date : Mar 20 – Jun 20 Description of Works Bored Piles Work Bored pile dia. 1.80 x 72.00 m.– Nrs 22
Read MoreSiam Patumwan Tower Client : SMCC (Thailand) Co., Ltd. Location : Bangkok Completion Date : Mar 20 – Jul 20 Description of Works Bored Piles Work Bored pile dia. 0.80 x 57.00 m.– Nrs 14 Bored pile dia. 1.00 x 57.00 m.– Nrs 21 Bored pile dia. 1.20 x 57.00 m.– Nrs 125 Bored pile
Read MoreEyse Sukhumvit43 Client : Singha Estate Plc. Location : Bangkok Completion Date : Nov 19 – Apr 20 Description of Works Bored Piles Work Bored pile dia. 0.80 x 48.00 m.– Nrs 137 Pile leg dia. 0.80 x 48.00 m.– Nrs 32 Diaphragm wall Works Diaphragm wall 800 mm., 20.00 m. depth – 3,860 m2
Read MorePolice Hospital Client : ITALIAN-THAI DEVELOPMENT PLC. Location : Ratchaprarop Road Completion Date : Jan 20 – Apr 20 Description of Works Bored Piles Work Bored pile dia. 0.80 x 54.00 m.– Nrs 45 Bored pile dia. 1.00 x 54.00 m.– Nrs 223 Pile Wall Pile wall dia. 0.80 x 17.30 m.– Nrs 57 Pile
Read MoreTraining, Personnel Development and Welfare Center at Immigration Bureau Client : ITALIAN-THAI DEVELOPMENT PLC. Location : Rama1 Road, Bangkok Completion Date : Jul 19 – Sep 19 Description of Works Bored pile dia. 1.00 x 54.00 m.– Nrs 179
Read MoreMRT Orange Line Project Contract E3 (Hua Mak – Khlong Ban Ma) Client : ITALIAN-THAI DEVELOPMENT PLC. Location : Bangkok Completion Date : Dec 17 – Jan20 Description of Works Diaphragm wall Works Diaphragm wall 800 mm., 30.00 m. depth – 21,527 m2 Diaphragm wall 1000 mm., 45.00 m. depth – 26,850 m2 Diaphragm wall
Read MoreS Residence Client : Fatima Co., Ltd. Location : Sriracha Completion Date : Nov19-Jan20 Description of Works Bored Piles Work (Rock Socket 1 meter) Bored pile dia. 0.80 x 24.00 m.– Nrs 19 Bored pile dia. 1.00 x 24.00 m.– Nrs 32 Bored pile dia. 1.20 x 24.00 m.– Nrs 47
Read MoreMotorway Bangyai-Kanchanaburi Section15 Client : Thongma Contractor Co.,Ltd Location : Nonthaburi Completion Date : Oct19 – Dec19 Description of Works Bored Piles Work Bored pile dia. 1.00 x 54.00 m.– Nrs 72
Read MorePhraya Wisut Pumping Station Client : River Engineering Co., Ltd. Location : Samut Prakan Completion Date : Sep 18 – Oct 19 Description of Works Piles Wall Work Bored pile dia. 1.00 x 30.00 m.– Nrs 118
Read MoreElevated Railway Map Kabao-Jira Client : ITALIAN-THAI DEVELOPMENT PLC. Location : Saraburi – Nakhon Ratchasima Completion Date : May 18 – Oct 19 Description of Works Bored Piles Work (Rock Socket 2-5 meter) Bored pile dia. 1.50 x 15.00 m.– Nrs 376 Bored pile dia. 1.20 x 15.00 m.– Nrs 164 Bored pile dia. 1.00
Read MoreBMT Gold Line Project Client : ITALIAN-THAI DEVELOPMENT PLC. Location : Khlong San Completion Date : Sep 18 – Oct 19 Description of Works Bored Piles Work Bored pile dia. 1.80 x 58.00 m.– Nrs 51 Bored pile dia. 1.50 x 55.00 m.– Nrs 38 Bored pile dia. 1.20 x 52.00 m.– Nrs 26 Bored
Read MoreThe Panora Pattaya Client : Mida Property Co., Ltd. Location : Pattaya Completion Date : Jun 19 – Jul 19 Description of Works Bored Piles Work Bored pile dia. 1.50 x 26.50 m.– Nrs 50 Bored pile dia. 1.20 x 26.50 m.– Nrs 5 Bored pile dia. 0.60 x 26.50 m.– Nrs 40 Rocket 1.00
Read MoreTerra Data Center Client : Technology Asset Co., Ltd. Location : Ramkhumhaeng Soi28 Completion Date : May 19 – Jul 19 Description of Works Bored Piles Work Bored pile dia. 1.50 x 60.00 m.– Nrs 145 Bored pile dia. 1.00 x 60.00 m.– Nrs 46
Read MoreMetro Flyover, Lampang Interchange Client : Chiang Mai Construction Co., Ltd. Location : Lampang Completion Date : Dec 18 – Mar 19 Description of Works Bored Piles Work Bored pile dia. 1.50 x 40.00 m.– Nrs 128 Bored pile dia. 1.20 x 35.00 m.– Nrs 30
Read MorePump Station Bangsri Muang (DP2) Client : ITALIAN-THAI DEVELOPMENT PLC. Location : Bangsri Muang Completion Date : May 19 Description of Works Bored Piles Work Bored pile dia. 0.60 x 37.00 m.– Nrs 10
Read MoreKok Kam Flyover, Samut Sakorn Client : ITALIAN-THAI DEVELOPMENT PLC. Location : Samut Sakorn Completion Date : Nov 18 – Feb 19 Description of Works Bored Piles Work Bored pile dia. 1.00 x 53.00 m.– Nrs 80
Read MoreRama3 – dao Khanong -Western Bangkok Outer Ring Road Expressway Project – Contract3 Client : ITD – VCB Joint Venture. Location : Bangkok Completion Date : Jan 21 – Jan24 Description of Works Barrette Pile Barrette Pile 1.00 x 3.00 x 58.00 m.– Nrs 102 Barrette Pile 1.00 x 3.80 x 56.00 m.– Nrs 169
Read MoreHighway No.82 Bang Khun Thian – Ban Phaeo Section Ekkachai – Ban Phaeo No.7 Client : ITALIAN-THAI DEVELOPMENT PLC. Location : Bangkok Completion Date : Jun 22 – Oct 23 Description of Works Bored Piling Works Bored Pile Dia 2.00×80.00 m.- 32No. Barrette Pile Barrette pile 1.00×3.80 m. approx. pile tip -57.00 m. (95 nos.)
Read MoreDao Khanong – Western Bangkok Outer Ring Road Expressway Project – Contract 2 Client : Tipakorn Co.,Ltd Location : Bangkok Completion Date : Jun 20 – Oct 23 Description of Works Bored Piles Work Bored pile dia. 1.00 x 30.00 m.– Nrs 28 Barrette Pile Barrette Pile 1.00 x 3.00 x 58.00 m.– Nrs 55
Read MoreOnnuch – LatkraBang Elevated Road Client : TARAWAN – NPA Joint Venture. Location : Bangkok Completion Date : Jun 22 – Feb23 Description of Works Bored Piling Works Bored Pile Dia 1.00×65.00 m.- 22 No. Barrette Pile Barrette Pile 1.20 x 3.00 x 65.00 m.– 30 No.
Read MoreMWA Tunnel Contract G-TN-9B Client : Nawarat PLC Location : Nonthaburi Completion Date : Jun 22 – Feb23 Description of Works Diaphragm Wall Diaphragm wall 1.20 m. thickness, toe level 50.00 m. — 3,200 m2 Shaft1 Diaphragm wall 1.20 m. thickness, toe level 50.00 m. — 2,500 m2 Shaft2 Diaphragm wall 1.20 m. thickness, toe
Read MoreDEPARTMENT OF CORRECTIONS HOSPITAL Client : ITALIAN-THAI DEVELOPMENT PLC. Location : Bangkok Completion Date : Nov 22 – Feb 23 Description of Works Bored Piling Works Bored pile dia. 0.80 m., approx. pile tip -45.00 m., COL.-1.00 m.(378 No.)
Read MoreKhlong Taweewattana Drainage Tunnel Client : Right Tunnelling Plc. Location : Bangkok Completion Date : Oct 22 – Dec 22 Description of Works Bored Piling Works Bored Pile dia. 1.00 m., pile tip level -55.00 m., Bored Pile dia. 1.20 m., pile tip level -55.00 m.,
Read MoreMap Ta Phut Industrial Port Development Phase3 (Stage1) Client : ITALIAN-THAI DEVELOPMENT PLC. Location : Map Ta Phut Completion Date : Nov 22 – Dec 22 Description of Works Bored Piling Works, with rock socket Bored Pile dia. 0.80 m., pile tip level 19-23.00 m., 12 nos. Bored Pile dia. 1.00 m., pile tip level
Read MoreFoundation Specialists. Contractor for Bored Piles, Diaphragm wall, Soil Cement Columns.